Newtown Creek Water Pollution Control Plant, Brooklyn, NY
![Screen Shot 2020-04-23 at 12.27.48 PM.png](https://images.squarespace-cdn.com/content/v1/5b7304df3917ee97d4100ec3/1587659054141-CX50YJCU8222RYBR024D/Screen+Shot+2020-04-23+at+12.27.48+PM.png)
Agency: New York City Department of Environmental Protection
Location: New York City, New York
Completion Date: 2019
The project scope included installation of interim emergency power facilities, replacement of the screening facility's sluice gates and screens and replacement of the two main sewage pumps, installed, tested, accepted and fully operational. CSM’s staff provided inspection services for demolition of existing digesters as well as the excavation, sheeting and pile foundation for the new residual facilities.
Other Featured Projects
CSM has served as a subconsultant to the Hazen and Sawyer, Malcolm Pirnie and Greeley and Hansen JV team for the past 20 years.
As a subconsultant to Malcolm Pirnie, Inc., CSM provided professional construction engineering inspection services related to the construction of the North River Water Pollution Control Plant located on the Hudson River.
As a subconsultant to GPI, CSM performed construction engineering inspection services on this $165 million project.
As a subconsultant to LKB, Inc., CSM provided resident engineering inspection services and a community liaison person for community participation on this project.
As a subconsultant to the URS (acquired by AECOM)/Arcadis team, CSM Engineering provided services at the plant for 16 years, beginning in 2003.
CSM’s staff provided inspection services for demolition of existing digesters as well as the excavation, sheeting and pile foundation for the new residual facilities.
CSM provided supervision for the Hicksville Hamlet Beautification Projects Phases I and II, for the Town of Oyster Bay Department of Public Works and Department of Intergovernmental Affairs.
CSM Engineering provided professional engineering design, construction engineering inspection and supervision services for the Village of Island Park.
As a subconsultant to Lane/Schiavone, CSM is providing quality management services for a Design-Build project that will lengthen 9 bridges over the Van Wyck Expressway.
CSM served on a panel assembled by Procifico Partners, to review a future Contract 9 for the Williamsburg Bridge. We provided our expertise in construction management during this value engineering study.
As a subconsultant to Nelson & Pope, CSM is providing construction inspection services on a Governor’s Office of Storm Recovery (GOSR) project focused on waterfront resiliency improvements.
As a subconsultant to Arcadis, CSM is providing construction management and inspection services for biological nutrient removal updates at the Rockaway and Coney Island Wastewater Treatment Plants.
As a subconsultant to the Hazen & Sawyer/Arcadis joint venture, CSM provided engineering and administrative support staff for this work flow, rehabilitation and repair project.
CSM is providing third-party review of the demolition procedures being proposed by the Contractor, Skanska, as part of the rehabilitation of the Ed Koch Queensboro Bridge under Contract 10.
As a subconsultant to Jacobs Engineering, CSM provided mechanical, plumbing and fire-protection inspection services for the rehabilitation of the Student Union building at Stony Brook University.
As a subconsultant to NV5, CSM is providing construction inspection services for priority surface treatments for NYSDOT assets in Region 10.
As a subconsultant to NV5, CSM provided construction engineering inspection services on this Design-Build project located in the Town of Babylon.
CSM is providing electrical, mechanical, civil, architectural, and environmental health and safety inspection services for wastewater plants managed by the Bureau of Wastewater Treatment.
As a subconsultant to LKB, CSM provided inspection services of the contractor’s work for the installation of electronic devices and requisite wiring.
As a subconsultant to HDR, CSM provided sewer inspection for this infrastructure project aimed to mitigate flooding in Chandler Street and the surrounding community.